खोज को काम करने के लिए 'कहां से' और 'कहां तक' दर्ज करें
पहला। अगला।
अंतिम।
पहला। अगला।
अंतिम।
मार्ग चैट








ऑफलाइन
1
2
3
4
5
6
7
8
9
0
छुपाएं
splash
ERR
परिवहन सूचनाएं
शुरुआत - अंत / header / cause / effectdescription
-

Banyo station upgrade


CONSTRUCTIONSTOP_MOVED
From Monday 22 January 2024 until late-2024, Banyo station will close for a major station accessibility upgrade. This means Shorncliffe line services will not stop at Banyo for the duration of the works. While the station is closed, alternative transport options will be available; includ

बस 306ट्रेन CLSHबस R604बस R348बस R585ट्रेन SHBNट्रेन SHBRट्रेन BNSHट्रेन SHCLट्रेन BRSH
-

Gold Coast Highway, Mermaid Waters - minor delays


CONSTRUCTIONUNKNOWN_EFFECT
From July 2023 until mid-November 2024, routes 700 and 777 may experience minor delays between Broadbeach South Station and Burleigh Heads, due to works on the Gold Coast Highway as part of the Gold Coast Light Rail Stage 3 project.Please allow extra travel time during this period.W

बस 700बस 777
-

Bundamba station has reopened


CONSTRUCTIONSTOP_MOVED
Bundamba station reopened on Monday 21 October!Replan your travel to make the most of your new station.

बस R604ट्रेन BRRWट्रेन BRIPट्रेन CAIPट्रेन CASPट्रेन CARWट्रेन IPCAट्रेन IPNAट्रेन IPRPट्रेन NAIPट्रेन NASPट्रेन RWBRट्रेन IPBRट्रेन IPRWट्रेन RPIPट्रेन RWCAट्रेन RWNAट्रेन RWRPट्रेन SPCAट्रेन SPNAबस 502बस 503बस R585ट्रेन RWIPबस R592बस R594बस R595
-

Mowbray Park ferry terminal upgrade


CONSTRUCTIONSTOP_MOVED
On Monday 8 April, Mowbray Park ferry terminal will close for approximately nine months for a major upgrade.Once complete, the new terminal will allow for two CityCats to dock at the same time, improving travel times. The new terminal will also have improved accessibility and covered waiting ar

एक्वाबस UQSLएक्वाबस NHAM
-

Buranda train station upgrade


CONSTRUCTIONSTOP_MOVED
From Monday 8 January 2024 until 2025, Buranda train station will close for a major station accessibility upgrade. This means Cleveland line services will not stop at Buranda for the duration of the works. While the station is closed, alternative transport options will be available

ट्रेन CLDBट्रेन CLSHबस R581बस R604ट्रेन DBCLट्रेन CLBRबस R348बस R585बस R295बस R296ट्रेन SHCLट्रेन BRCL
-

Get ready to ride - Logan West, Flagstone, Beaudesert and Springfield


OTHER_CAUSEADDITIONAL_SERVICE
From Monday 16 December, we’re improving some bus services in parts of Logan West, Springfield, Beaudesert and Flagstone.This includes changes for routes 534, 535, 540, 542, 551, 561 and 587.With 350 new bus trips being introduced to your network you'll have

बस 551बस 535बस 561बस 587बस 534बस 540बस 542
-

King George Square and Queen Street bus stations - stop changes


CONSTRUCTIONSTOP_MOVED
Temporary bus stop arrangements are in place at King George Square and Queen Street bus stations to enable Brisbane Metro construction works. While both stations remain open during these works, some bus services have moved from King George Square station and Queen Street bus station to other ne

बस 170बस 171बस 66बस 385बस 425बस 40बस P426बस P443बस 430बस 431बस 435बस 450बस 222बस 444बस 111बस 446बस 333बस 453बस 454बस 460बस 61बस 330बस 340बस 345बस P176
-

Route 169 – completion of metro vehicle preview


OTHER_CAUSEMODIFIED_SERVICE
From Monday 18 November, regular bus fleet will return to servicing route 169 following completion of the Brisbane Metro preview phase.There will be minor timetable changes and route 169 will return to servicing Dutton Park Place. If you catch route 169 from UQ Lakes stat

बस 169
-

Yeerongpilly station - extended closure


CONSTRUCTIONSTOP_MOVED
On Monday 18 September 2023, Yeerongpilly station closed for important Cross River rail upgrade works.

ट्रेन DBBNबस R591बस R604ट्रेन FGBNट्रेन BRBNबस R585ट्रेन VLBNबस 104बस 105ट्रेन BNVLट्रेन SHBNट्रेन BNSHट्रेन BNBNट्रेन BNBRट्रेन BNFGबस 108बस 19
-

Burpengary station has reopened


CONSTRUCTIONSTOP_MOVED
Burpengary station reopened on Monday 9 September!Replan your travel to make the most of your new station.

बस R604ट्रेन BRCAट्रेन BRGYट्रेन BRNAट्रेन CABRट्रेन CAIPट्रेन CARWट्रेन CASPट्रेन CADBट्रेन DBCAट्रेन GYBRट्रेन IPCAट्रेन IPNAट्रेन NABRट्रेन NAIPट्रेन NASPट्रेन RWCAट्रेन RWNAट्रेन RWRPट्रेन SPCAट्रेन SPNAबस R585
-

Get onboard your new northern Gold Coast bus routes


OTHER_CAUSEADDITIONAL_SERVICE
From Monday 19 June, you'll have access to two new bus routes in Coomera and Pimpama: 720 - Coomera station to Pimpama City Shopping Centre 724 - Coomera station to Pimpama Sports Hub With lots of new stops, we're making it easier for you to get around your neighbourhood or connect with

बस 721बस 720बस 724
-

12pm route 713 to Southport station cancelled


OTHER_CAUSEREDUCED_SERVICE
The 12pm route 713 to Southport station is cancelled due to mechanical issues.

बस 713
-

2:49pm route 282 to Victoria Point delayed up to 16 minutes


OTHER_CAUSESIGNIFICANT_DELAYS
The 2:49pm route 282 to Victoria Point is delayed up to 16 minutes due to mechanical issues.

बस 282
-

5:25pm route P455 to Riverhills cancelled


OTHER_CAUSEREDUCED_SERVICE
The 5:25pm route P455 to Riverhills is cancelled due to traffic congestion.

बस P455
-

5:10pm route 333 to Cultural Centre cancelled


OTHER_CAUSEREDUCED_SERVICE
The 5:10pm route 333 to Cultural Centre is cancelled due to traffic congestion.

बस 333
-

2:43pm route 503 to Bundamba is delayed up to 15 minutes


OTHER_CAUSESIGNIFICANT_DELAYS
The 2:43pm route 503 to Bundamba is delayed up to 15 minutes due to traffic congestion.

बस 340
-

5:20pm route 636 to Nambour station cancelled


OTHER_CAUSEREDUCED_SERVICE
The 5:20pm route 636 to Nambour station is cancelled due to mechanical issues.

बस 636
-

6:28pm Central to Springfield train running express Indooroopilly to Darra


OTHER_CAUSEMODIFIED_SERVICE
The 6:28pm Central to Springfield train will run express from Indooroopilly to Darra due to an incident requiring emergency services.

ट्रेन CASPबस R604बस R585ट्रेन NASPट्रेन SPBRट्रेन RPSPट्रेन SPCAट्रेन SPNAट्रेन SPRPट्रेन BRSP
-

Dutton Park station reopening


OTHER_CAUSEMODIFIED_SERVICE
Dutton Park station will reopen on Monday 21 October, with construction works continuing until late-2025.You can access the station via stairs and lifts from the Annerley Road, and Noble Steet station entries.Access from Kent Street will remain closed until works in that area of the station are comp

ट्रेन DBBNबस R591बस R604ट्रेन FGBNबस R585ट्रेन VLBNट्रेन BNVLट्रेन SHBNट्रेन BNSHट्रेन BNBNट्रेन BNBRट्रेन BNFGट्रेन BRBN
-

2:45pm route 100 to Forest Lake Shops cancelled


OTHER_CAUSEREDUCED_SERVICE
The 2:45pm route 100 to Forest Lake Shops is cancelled due to staff availability.

बस 100
-

Return to schedule - 4:38pm route 251 to Ormiston


OTHER_CAUSEREDUCED_SERVICE
The 4:38pm route 251 to Ormiston is returned to schedule after an earlier cancellation due to staff availability.

बस 251
-

Morningside station upgrade


CONSTRUCTIONSTOP_MOVED
From Monday 22 January 2024 until late-2024, Morningside station will close for a major station accessibility upgrade. This means Cleveland line services will not stop at Morningside for the duration of the works. While the station is closed, alternative transport options will be available;

ट्रेन CLDBट्रेन CLSHबस 227बस R581ट्रेन CLBRट्रेन DBCLबस R348बस R585बस R604बस 235बस R295बस R296ट्रेन SHCLट्रेन BRCL
-

5:08pm route 542 to Park Ridge park 'n' ride cancelled


OTHER_CAUSEREDUCED_SERVICE
The 5:08pm route 542 to Park Ridge park 'n' ride is cancelled due to staff availability.

बस 542
-

3pm route 700 to Broadbeach South station cancelled


OTHER_CAUSEREDUCED_SERVICE
The 3pm route 700 to Broadbeach South station is cancelled due to staff availability.

बस 700
-

5:00pm route 602 to Caloundra cancelled


OTHER_CAUSEREDUCED_SERVICE
The 5:00pm route 602 to Caloundra is cancelled due to mechanical issues.

बस 602
-

5:01pm Central to Springfield Central train is delayed up to 15 minutes and cancelled from Darra to Springfield Central


OTHER_CAUSESIGNIFICANT_DELAYS
The 5:01pm Central to Springfield Central train is delayed up to 15 minutes and cancelled from Darra to Springfield Central due to an incident requiring emergency services.

ट्रेन CASPबस R604बस R585ट्रेन NASPट्रेन SPBRट्रेन RPSPट्रेन SPCAट्रेन SPNAट्रेन SPRPट्रेन BRSP
-

2:41pm route 250 to Carindale Shopping Centre interchange cancelled


OTHER_CAUSEREDUCED_SERVICE
The 2:41pm route 250 to Carindale Shopping Centre interchange is cancelled due to staff availability.

बस 250
-

5:10pm route 600 to Caloundra station cancelled


OTHER_CAUSEREDUCED_SERVICE
The 5:10pm route 600 to Caloundra station is cancelled due to staff availability.

बस 600
-

4:55pm route 335 to Sandgate bus station cancelled


OTHER_CAUSEREDUCED_SERVICE
The 4:55pm route 335 to Sandgate bus station is cancelled due to staff availability.

बस 335
-

5:21pm route 616 to Maroochydore station cancelled


OTHER_CAUSEREDUCED_SERVICE
The 5:21pm route 616 to Maroochydore station is cancelled due to congestion.

बस 616
-

4:30pm Nambour to Central train delayed 30 mins & cancelled Nambour to Woombye


TECHNICAL_PROBLEMSIGNIFICANT_DELAYS
The 4:30pm Nambour to Central train is delayed up to 30 minutes and cancelled between Nambour and Woombye due to a signalling issue.

बस R604ट्रेन GYBRबस R585ट्रेन IPNAट्रेन NABRट्रेन NAIPट्रेन NASPट्रेन RWNAट्रेन RWRPट्रेन SPNAट्रेन BRGYट्रेन BRNA
-

5:45pm route 352 to Mcdowall cancelled


OTHER_CAUSEREDUCED_SERVICE
The 5:45pm route 352 to Mcdowall is cancelled due to congestion.

बस 352
-

5:39pm route 60 to Teneriffe cancelled


OTHER_CAUSEREDUCED_SERVICE
The 5:39pm route 60 to Teneriffe is cancelled due to traffic congestion.

बस 60
-

4:55pm route 274 to Cleveland station cancelled


OTHER_CAUSEREDUCED_SERVICE
The 4:55pm route 274 to Cleveland station is cancelled due to staff availability.

बस 274
-

3:37pm route 680 to Redcliffe delayed up to 16 minutes


OTHER_CAUSESIGNIFICANT_DELAYS
The 3:37pm route 680 to Redcliffe is delayed up to 16 minutes due to traffic congestion.

बस 680
-

4:47pm route TX7 to Helensvale cancelled


OTHER_CAUSEREDUCED_SERVICE
The 4:47pm route TX7 to Helensvale is cancelled due to traffic congestion.

बस TX7
-

4:51pm route 345 to Aspley Hypermarket interchange cancelled Roma Street busway station to Aspley Hypermarket interchange


OTHER_CAUSEREDUCED_SERVICE
The 4:51pm route 345 to Aspley Hypermarket interchange is cancelled between Roma Street busway station and Aspley Hypermarket interchange due to congestion.

बस 345
-

4:43pm route 509 to Yamanto delayed up to 16 minutes


OTHER_CAUSESIGNIFICANT_DELAYS
The 4:43pm route 509 to Yamanto is delayed up to 16 minutes due to late running of a previous service.

बस 509
-

5:15pm route 100 to Forest Lake Shops cancelled


OTHER_CAUSEREDUCED_SERVICE
The 5:15pm route 100 to Forest Lake Shops is cancelled due to staff availability.

बस 100
-

5:10pm route 600 to Maroochydore cancelled


OTHER_CAUSEREDUCED_SERVICE
The 5:10pm route 600 to Maroochydore is cancelled due to traffic congestion.

बस 600
-

Lindum station upgrade


CONSTRUCTIONSTOP_MOVED
From Monday 22 January 2024 until late-2024, Lindum station will close for a major station accessibility upgrade. This means Cleveland line services will not stop at Lindum for the duration of the works. While the station is closed, alternative transport options will be available; includ

ट्रेन CLDBट्रेन CLSHबस R581बस R604बस 229ट्रेन CLBRट्रेन DBCLबस R348बस R585बस R295बस R296ट्रेन SHCLट्रेन BRCLबस 223बस 224
-

5:59pm route 370 to Chermside cancelled


OTHER_CAUSEREDUCED_SERVICE
The 5:59pm route 370 to Chermside is cancelled due to traffic congestion.

बस 370
-

3:20pm route 610 to Maroochydore cancelled


OTHER_CAUSEREDUCED_SERVICE
The 3:20pm route 610 to Maroochydore is cancelled due to mechanical issues.

बस 610
-

Delays 15 mins - Sunshine Coast line


TECHNICAL_PROBLEMSIGNIFICANT_DELAYS
Sunshine Coast line trains travelling between Woombye and Nambour are delayed up to 15 minutes due to a signalling issue.Rail replacement buses will run between Woombye and Nambour.

बस R604ट्रेन GYBRबस R585ट्रेन IPNAट्रेन NABRट्रेन NAIPट्रेन NASPट्रेन RWNAट्रेन RWRPट्रेन SPNAट्रेन BRGYट्रेन BRNA
-

5:23pm route 209 to Carindale Shopping Centre cancelled


OTHER_CAUSEREDUCED_SERVICE
The 5:23pm route 209 to Carindale Shopping Centre interchange is cancelled due to mechanical issues.

बस 209
-

5:19pm Domestic Airport to Central train running express International Airport to Bowen Hills


OTHER_CAUSEMODIFIED_SERVICE
The 5:19pm Domestic Airport to Central train will run express between International Airport and Bowen Hills. We are awaiting further details.

बस R604बस R585ट्रेन BDBRट्रेन BDVLट्रेन BRBDट्रेन VLBDट्रेन BRBR
-

5:21pm route 120 to Queen Street bus station cancelled Garden City to QEII Hospital


OTHER_CAUSEREDUCED_SERVICE
The 5:21pm route 120 to Queen Street bus station is cancelled between Garden City Shopping Centre interchange and Troughton Rd at QEII Hospital due to congestion.

बस 120
-

5:25pm route 381 to The Gap cancelled


OTHER_CAUSEREDUCED_SERVICE
The 5:25pm route 381 to The Gap is cancelled due to traffic congestion.

बस 381
-

5:51pm route 345 to Aspley cancelled


OTHER_CAUSEREDUCED_SERVICE
The 5:51pm route 345 to Aspley is cancelled due to traffic congestion.

बस 345
-

Gold Coast Highway - temporary stop closures


CONSTRUCTIONSTOP_MOVED
Due to Gold Coast Light Rail works, several stops along the Gold Coast Highway will be temporarily closed.If you travel on routes 700, 765 or school services, your journey may be impacted by these stop closures. Please see below for a list of stops affected, their closure dates, and

-

South Coolum Road, Coolum Beach - temporary stop closure


OTHER_CAUSESTOP_MOVED
From Monday 18 until Friday 22 November, the stop on South Coolum Road near Wandaa Court will be closed due to roadworks.During this time, please use the alternative stops shown below.

-

Edward Street, Brisbane City - temporary stop closure


OTHER_CAUSESTOP_MOVED
From Friday 28 June until last service Friday 13 December, stop 146 on Edward Street near Margaret Street will be closed due to demolition works.During this time, if you travel on route 40, please use stop 96A on Alice Street shown below.

-

Newdegate Street, Greenslopes - temporary stop closure


CONSTRUCTIONSTOP_MOVED
From Friday 18 October to Sunday 7 December, stop 22 on Newdegate Street near Denman Street will be closed due to construction.During this time, if you travel on route 172 or P173, please use stop 23 on Newdegate Street at Greenslopes Hospital shown below.

-

Woolloongabba station - platform 2 access changes


CONSTRUCTIONDETOUR
From Monday 25 September 2023 until early 2025, access to platform 2 at Woolloongabba station will change as construction of the new Cross River Rail Woolloongabba station progresses.The footpath between Woolloongabba station platform 2 and Main Street will temporarily close.Access to platform 2 wil

-

Lift outage - Kuraby station, Beenleigh Road entry to footbridge


MAINTENANCENone
The lift on Beenleigh Road entry to footbridge at Kuraby station is currently out of service. Please call 13 16 17 or SMS 0428 774 636 if you require assistance.Technicians have been notified.

-

Health Care Drive, Springfield Central - temporary stop closure


MAINTENANCESTOP_MOVED
Until mid-March 2025, ??????the stop on Health Care Drive at Mater Private Hospital will be closed due to construction.During this time, if you travel on route 533, please use the alternative stop at UniSQ shown below.Map legend Closed stopHealth Care Dr at Mater Private Hospital (St

-

Helensvale Road, Helensvale - temporary stop closure


CONSTRUCTIONSTOP_MOVED
From Wednesday 4 September 2024 to Thursday 30 January 2025, the stop on Helensvale Road at Monterey Keys Drive will be closed due to roadworks.During this time, if you travel on route 718 or school services, please use the temporary stop shown below.

-

King Street, Caboolture - temporary stop closure


CONSTRUCTIONSTOP_MOVED
From Monday 8 October until Friday 20 December, the stop on King Street at Maple Lane will be closed due to construction.During this time, if you travel on route 653, 7016 or 7222 please use the temporary stop on King Street near Wararba Crescent approximately 85m away.

-

Pacific Parade, Currumbin - temporary stop closure


CONSTRUCTIONDETOUR
From Monday 6 May until late-2024, the stop on Pacific Parade at Currumbin Beach will be closed due to Gold Coast City Council works on the seawall.During this time, if you travel on route 767, 768 or school services, please use the alternative stop on Pacific Parade nearby Murraba

-

Landsborough Avenue, Scarborough - temporary stop closure


CONSTRUCTIONSTOP_MOVED
On Thursday 21 and Friday 22 November, the stop on Landsborough Avenue at Bunton Street will be closed due to construction.During this time, if you travel on route 690, 699 and school services, please use the alternative stop on Landsborough Avenue at Rock Street shown below.

-

Adelaide Street, Brisbane City - evening stop closures


CONSTRUCTIONSTOP_MOVED
From Sunday 18 February until late 2024, all bus stops on Adelaide Street, located between George Street and Albert Street, will close between 7pm and 5am, Sunday to Thursday.During these times your bus service will move to alternative stops nearby on Adelaide Street, between Albert Street and Edwar

-

Beenleigh line timetable changes - Fairfield to Salisbury


CONSTRUCTIONMODIFIED_SERVICE
Until mid-2025, there will be changes to some Beenleigh services in the afternoon peaks due to important Cross River Rail works.Some peak services will run express through three or more of the following stations - Dutton Park, Fairfield, Yeronga, Moorooka and Salisbury. If you live close t

-

Broadbeach South station - crossing and platform changes


CONSTRUCTIONOTHER_EFFECT
Works to connect the existing tram network and Gold Coast Light Rail Stage 3 (GCLR3) track extension started on Sunday 3 March at Broadbeach South station, with the installation of water barricades, fencing and other initial construction activities.At this stage there are no changes to tram times or

-

Redbank Plains Road, Bellbird Park - stop changes


CONSTRUCTIONSTOP_MOVED
Until mid-December 2024, the following stops on Redbank Plains Road will be impacted by roadworks.If you travel on route 524 or school services, please check the alternative stops shown below.

-

Lift outage - Roma Street station, platforms 8 and 9 to subway


MAINTENANCENone
The lift on platforms 8 and 9 to subway at Roma Street station is currently out of service. Please call 13 16 17 or SMS 0428 774 636 if you require assistance.Technicians have been notified.

-

Jarnahill Drive and Suncoast Beach Drive, Mount Coolum - temporary stop closures


CONSTRUCTIONSTOP_MOVED
From Monday 16 September until Friday 29 November, the following stops in Mount Coolum will be closed due to roadworks.If you normally catch route 622 or a school service from here, please use the alternatives on David Low Way shown below.

-

Lift outage - Banoon station


MAINTENANCENone
The lift at Banoon station, Dyson Street car park to footbridge is currently out of service. Please call 13 16 17 or SMS 0428 774 636 if you require assistance.Technicians have been notified.

-

Lift outage - Yeronga station, platform 1


MAINTENANCENone
The lift on platform 1 at Yeronga station is currently out of service. Please call 13 16 17 or SMS 0428 774 636 if you require assistance.Technicians have been notified.

-

Wardoo Street and Cotlew Street, Ashmore - temporary stop closures


CONSTRUCTIONSTOP_MOVED
From Monday 29 April until late December, the following stops will be closed due to roadworks.During this time, if you travel on routes 737, 741 and school services, please use the alternative stops shown below.

-

Lift outage - Kingston station, platform 1 and 2 to footbridge


MAINTENANCENone
The lift on platform 1 and 2 to footbridge at Kingston station is currently out of service. Please call 13 16 17 or SMS 0428 774 636 if you require assistance.Technicians have been notified.

-

Brisbane Road, Mooloolaba - temporary stop closure


OTHER_CAUSESTOP_MOVED
From Monday 9 October 2023 until further notice, the stop on Brisbane Road at Mooloolaba Bowls Club will be closed due to issues with bus travel along Foote Street. During this time, if you travel on routes 600, 611, 615, please use the alternative stops belo

-

Lift outage - Burpengary station


MAINTENANCENone
The lift on platform 1 at Burpengary station is currently out of service. Please call 13 16 17 or SMS 0428 774 636 if you require assistance.Technicians have been notified.

-

Lift outage - Hemmant station, platforms 1 and 2


MAINTENANCENone
The lift on platforms 1 and 2 at Hemmant station is currently out of service. Please call 13 16 17 or SMS 0428 774 636 if you require assistance.Technicians have been notified.

-

Brisbane Street, Beaudesert - temporary stop closure


CONSTRUCTIONSTOP_MOVED
From Monday 5 August to early-December, the stop on Brisbane Street at Eaglesfield Street will be closed due to roadworks.During this time, if you travel on route 540, please use the alternative stop near Tubber Street shown below.

-

Lift outage - Woodridge station, platforms 1 and 2 to subway


MAINTENANCENone
The lift on platforms 1 and 2 to the subway at Woodridge station is currently out of service. Please call 13 16 17 or SMS 0428 774 636 if you require assistance.Technicians have been notified.

-

Redland Bay Road, Victoria Point - temporary stop closure


CONSTRUCTIONSTOP_MOVED
From Tuesday 23 April until Thursday 28 November, the stop on Redland Bay Road at Magnolia Parade will be closed due to the Cleveland-Redland Bay Road upgrade.During this time, please use the stop on Redland Bay Road at Rosevale Court shown below.

-

Redland Bay Road, Victoria Point - temporary stop closures


CONSTRUCTIONSTOP_MOVED
Until February 2025, the following Redland Bay Road stops will be closed due to roadworks.During this time, if you travel on route 250, 272, 280, 281, 282 or school routes please use the alternative stops below.

OK

समीक्षा छोड़ने के लिए, कृपया पंजीकरण करें

संख्याओं को दर्ज करने के लिए आवश्यक है पंजीकरण


मार्ग:
समयमार्ग