खोज को काम करने के लिए "कहाँ से" और "कहाँ तक" दर्ज करें
पहला अगला
अंतिम
पहला अगला
अंतिम
Google PlayApp Store



1
2
3
4
5
6
7
8
9
0
छिपाएँ
splash
ERR
परिवहन सूचनाएँ
शुरुआत - अंत / header / cause / effectdescription
-

Salisbury station now open


CONSTRUCTIONADDITIONAL_SERVICE
On Monday 2 March, Salisbury station reopened. The station has been rebuilt to be fully accessible, with a new overpass, platform canopies, kiss 'n' ride and station facilities. With train services now available at the station, StationLink route 19 no longer services the bus stops on

ट्रेन DBBNट्रेन BNCLट्रेन BNSHट्रेन FGBNट्रेन CLBNट्रेन SHBNट्रेन VLBNट्रेन BNVLट्रेन BNBNट्रेन BNBRट्रेन BNFGट्रेन BRBNबस 19
-

New trial weekend service for Maroochydore and Alexandra Headland


OTHER_CAUSEADDITIONAL_SERVICE
It's now even easier to travel between Maroochydore and Alexandra Headland with your new trial route 613.Route 613 runs every 30 minutes, from 6am to 6pm on weekends.There are also new bus stops at:Sunrise Drive near Sunshine Cove Park (Stop ID 322405)Sunshine Cove Way near Sunrise Drive

बस 613
-

New late night trips and stop for routes 600 and 616


OTHER_CAUSEADDITIONAL_SERVICE
You can catch late night route 600 and 616 buses on Friday and Saturday nights from a new dedicated stop on Maroochydore Road at Beach Road (just outside Guzman y Gomez).

बस 616बस 600
-

5:58am route 281 to Brisbane City delayed up to 18 minutes


OTHER_CAUSESIGNIFICANT_DELAYS
The 5:58am route 281 to Brisbane City is delayed up to 18 minutes due to congestion.

बस 281
-

7:47am route 745 to Nerang cancelled


OTHER_CAUSEREDUCED_SERVICE
The 7:47am route 745 to Nerang is cancelled due to mechanical issues.

बस 745
-

Weekday track closure - Sunshine Coast line


CONSTRUCTIONREDUCED_SERVICE
Plan ahead using our journey planner to find your best travel option.

ट्रेन GYBRट्रेन IPNAट्रेन NABRट्रेन GYNAट्रेन NAIPट्रेन NAGYट्रेन NASPट्रेन SPNAट्रेन RWNAट्रेन RWRPट्रेन NANAट्रेन BRGYट्रेन BRNA
-

Better bus services are coming for Logan South


OTHER_CAUSEADDITIONAL_SERVICE
We've made changes, starting from Monday 23 February for routes 562, 563, 564, 565, 568 and 580 to deliver more frequent trips and improved access to key local destinations.These changes are part of the Logan Growth program, which aims to strengthen public transpo

बस 563बस 580बस 565बस 562
-

Shorncliffe station renewal and upgrade


CONSTRUCTIONSTOP_MOVED
From Saturday 29 November 2025 until mid-2026, Shorncliffe station is closed for major station renewal and accessibility upgrades.This means Shorncliffe line services will not stop at Shorncliffe for the duration of the works, running between Brisbane City and Sandgate station instead.While the stat

ट्रेन CLSHट्रेन BNSHबस R348बस R604बस R585ट्रेन SHBNट्रेन SHCAट्रेन CASHट्रेन SHBRट्रेन SHCLट्रेन BRSH
-

7:03am route 333 to Chermside cancelled


ACCIDENTREDUCED_SERVICE
The 7:03am route 333 to Chermside is cancelled due to mechanical issues.

बस 333
-

Delays 20 mins - Moggill Road, Kenmore


OTHER_CAUSESIGNIFICANT_DELAYS
Buses travelling along Moggill Road, Kenmore towards Brisbane City are delayed up to 20 minutes due to congestion.

बस 446बस 427बस 428बस 430बस 443बस 431बस 435बस 425बस 432बस 433बस 444
-

First Avenue, Maroochydore - stop relocations


CONSTRUCTIONSTOP_MOVED
From Friday 20 February the following stops in Maroochydore will relocate due to the First Avenue upgrade project. If you normally use these stops when travelling on route 600 or school services, please use the alternatives shown below.

-

Delays 20 mins - Griffith University, Mt Gravatt


OTHER_CAUSESIGNIFICANT_DELAYS
Buses travelling via Griffith University, Mt Gravatt towards Brisbane City are delayed up to 20 minutes due to congestion.

बस 279बस 280बस 545बस 281बस 551बस 77बस 299बस 137बस 141बस 142बस 555बस 561बस 186बस 554बस 26बस 573बस 575बस 577बस 579बस 576बस 546बस 569बस 581बस M1बस 115बस 118बस 578बस 123बस 125बस 130बस 261बस 131बस 262बस 135बस 138बस 139बस 140बस 150बस 153बस 155बस 156बस 276बस 161बस 162बस 169
-

8:19am Domestic Airport to Boggo Road train cancelled


OTHER_CAUSEREDUCED_SERVICE
The 8:19am Domestic Airport to Boggo Road train is cancelled due to a train fault.

ट्रेन CLBRट्रेन BDBRट्रेन BDVLट्रेन BRBDट्रेन VLBDट्रेन BRBR
-

6:15am route 279 to Brisbane City delayed up to 15 minutes


OTHER_CAUSESIGNIFICANT_DELAYS
The 6:15am route 279 to Brisbane City is delayed up to 15 minutes due to congestion.

बस 279
-

7:15am route 443 to Brisbane City cancelled Moggill to Moggill Rd at Kenmore Central, stop 37, Kenmore


OTHER_CAUSEREDUCED_SERVICE
The 7:15am route 443 to Brisbane City is cancelled from Moggill to Moggill Rd at Kenmore Central, stop 37, Kenmore due to mechanical issues.

बस 443
-

7:30am route 375 to Spring Hill cancelled Chiswick Road West, stop 19, Bardon to Spring Hill


OTHER_CAUSEREDUCED_SERVICE
The 7:30am route 375 to Spring Hill is cancelled from Chiswick Rd at Chiswick Road West, stop 19, Bardon to Spring Hill due to a traffic accident.

बस 375
-

7:46am Central to Domestic Airport train cancelled


OTHER_CAUSEREDUCED_SERVICE
The 7:46am Central to Domestic Airport train is cancelled due to a train fault.

ट्रेन CLBRट्रेन BDBRट्रेन BDVLट्रेन BRBDट्रेन VLBDट्रेन BRBR
-

Moorooka station - extended closure


CONSTRUCTIONMODIFIED_SERVICE
On Monday 2 March, Moorooka station temporarily closed as part of the Cross River Rail Delivery Authority's rolling program of station accessibility upgrades.

बस 19
-

Delays 10 mins and stops missed - Gold Coast Hwy, Burleigh Heads


CONSTRUCTIONDETOUR
Route 700 and 777 travelling in both directions are delayed up to 10 minutes due to a road closure. Stops missed - Gold Coast Highway, Burleigh HeadsRoute 700 travelling in both directions and route 777 towards Broadbeach South will be temporarily missing the below stops.

बस 700बस 777
-

7:20am route 562 to Loganholme delayed up to 25 minutes


OTHER_CAUSESIGNIFICANT_DELAYS
The 7:20am route 562 to Loganholme is delayed up to 25 minutes due to rerouting.

बस 562
-

6:39am route 265 to Brisbane City delayed up to 17 minutes


OTHER_CAUSESIGNIFICANT_DELAYS
The 6:39am route 265 to Brisbane City is delayed up to 17 minutes due to congestion.

बस 265
-

Station Road and Mathews Street, Bethania - permanent stop changes


OTHER_CAUSESTOP_MOVED
From Monday 23 February, routes 562 and 563 won't service the following Bethania bus stops due to Logan bus network changes. School routes won't be affected.Please use the alternative stops shown below.

-

Gold Coast Highway - temporary stop closures


CONSTRUCTIONSTOP_MOVED
Due to Gold Coast Light Rail works, several stops along the Gold Coast Highway will be temporarily closed.If you travel on routes 700, 753, 754, 757, 764, 765, 757, 777 or school services, your journey may be impacted by these stop closures. Pleas

-

Thompson Street, Deception Bay - temporary stop closure


CONSTRUCTIONSTOP_MOVED
From Wednesday 4 to Wednesday 18 March, the stop on Thompson Street near Elna Court will be closed due to construction works.During this time, if you travel on route 665 or school services, please use the temporary stop shown below.

-

Brisbane Road, Mooloolaba - temporary stop closure


OTHER_CAUSESTOP_MOVED
From Monday 9 October 2023 until further notice, the stop on Brisbane Road at Mooloolaba Bowls Club will be closed due to issues with bus travel along Foote Street. During this time, if you travel on routes 600, 611, 615, please use the alternative stops belo

-

Woolloongabba station - platform 2 access changes


CONSTRUCTIONDETOUR
Until early 2026, the footpath between Woolloongabba station platform 2 and Main Street will remain closed while construction of the new Cross River Rail Woolloongabba station progresses.Access to platform 2 is via the Stanley Street pedestrian overpass which has both stairs and a lift.For major eve

-

Ipswich Road, Moorooka - temporary stop closure


CONSTRUCTIONSTOP_MOVED
From Tuesday 27 January until further notice, the stop on Ipswich Road at Moorooka station will be closed due to the upgrade of Moorooka station for Cross River Rail works.During this time, if you travel on routes 19 or 116, please use the alternative stop, stop 38/90 on Ipswich Road at

-

Cooroy Street, Dicky Beach - temporary stop closure


CONSTRUCTIONSTOP_MOVED
From Monday 9 February to Friday 1 May, the stops on Cooroy Street near Coochin Street will be closed due to road works.During this time, if you travel on routes 600, 607 and school services 5541, 5551, 5702 and 5717, please use the alternative stops shown below.

-

Lorenzo Drive and Yaun Street, Coomera - temporary stop closure


CONSTRUCTIONSTOP_MOVED
From Monday 9 March to Tuesday 7 April, the following stops on Lorenzo Drive and Yaun Street will be closed due to roadworks.During this time, if you travel on route 723 or school services, please use the alternative stops shown below.

-

Wilson Street, Labrador - temporary stop closure


CONSTRUCTIONSTOP_MOVED
From Tuesday 1 June 2025 to May 2026, the stop on Wilson Street at Jimmieson Avenue will be closed due to construction works.During this time, if you travel on route 713, please use the alternative stop shown below.

-

Brisbane Road, Arundel - route 719 stop change


OTHER_CAUSEMODIFIED_SERVICE
From Monday 9 March, route 719 will no longer service the stop on Brisbane Road at Pine Ridge Road due to bus accessibility and route improvements.If you travel on route 719, please use the alternative stops shown below.

-

Muir Street, Cannon Hill - temporary stop closures


CONSTRUCTIONSTOP_MOVED
Until 9pm on Sunday 31 May, the following stops on Muir Street will be closed due to Queensland Urban Utilities works.During this time, if you travel on route 232, please use the alternative stops on Dahlia Street shown below.

-

Dohles Rock Road, Murrumba Downs - temporary stop closure


DEMONSTRATIONSTOP_MOVED
From Monday 10 November 2025 to May 2026, the stop at Murrumba Downs Shopping Centre on Dohles Rocks Road, will be closed due to roadworks.During this time, if you travel on school services 6702, 6706, 6820, 6824, 6831, 6833, 6860, 6861 or 6871,

-

Warrungen Way, Ashmore - temporary stop closure


CONSTRUCTIONSTOP_MOVED
From Monday 16 to Monday 23 March, the stop on Warrungen Way near Yangoora Crescent will be closed due to a stop upgrade.During this time, if you travel on routes 738 and 741, please use the temporary stop on Warrungen Way near Maralinga Drive shown below.

OK

समीक्षा छोड़ने के लिए, कृपया पंजीकरण करें

संख्याओं को दर्ज करने के लिए आवश्यक है पंजीकरण